In January 2024 we held our first public drop-in session to share our plan which included both short term and long-term interventions to improve surface water flooding and spills from the local storm overflow.

As part of the plan, we are committed to

  • Increase the treatment capacity of Staveley works
  • Contribute towards a council-led project to remove surface water in the village, as well as funding more SuDSPods at the local school and large buildings in the area to capture rainwater run-off. We also offered every residential property in the village a water butt. 
  • CCTV the entire network in the area to collect data about the flow through the network which will support the design of an integrated solution for Staveley's water management problems.   

Our goals

  • Reduce the spills of sewage into the River Kent to an average of no more than 10 per year on a 10 year average from 2029
  • Have no sewage spills on the streets of Staveley to current design standards which is a 1 in 30-year storm event

Taking action for Staveley

Over the past 12 months we have:

  • Increased treatment capacity at Staveley wastewater treatment works.
  • Completed a full camera survey of the sewer pipes in Staveley. The pipes were found to generally be in good condition.
  • Repaired a minor defect on Windermere Road which was repaired at the end of September.
  • Installed flow monitors inside the sewers which are capturing important data. These help us build an accurate picture of the flows in our sewer pipes and are key at helping design the engineering solution for Staveley
  • Handed out 150 water butts to Staveley community
  • Installed rainwater pods in the village and at the school
  • Held education sessions with the school
  • Kept the community informed with regular newsletters
  • Held regular catch ups with Staveley Clean Water Clean Streets Group, Environment Agency, Westmorland and Furness Council, Clean River Kent Campaign, and Lake District National Park Authority
  • During this time our engineers have been developing the long-term engineering solution for Staveley. Work taking place has included:

    • Ecological and wildlife surveys - to understand and identify areas where we need to keep construction to a minimum
    • Modelling – to understand rainfall and population growth to help design the best solution
    • Meeting the community - engaging with landowners and stakeholders to share our plans
  • We’re also undertaking ground investigations to understand the local geology and rock formation. We carry out various surveys to confirm ground conditions or the location of other utility pipes and cables.

    The surveys and investigations may involve digging or drilling small holes into the ground using specialist equipment or clearing shrubs and vegetation before the main work is due to begin.

    This work will not impact your existing water and wastewater services and we’ll endeavour to keep any disruption to a minimum.

Important Notice

Cold Weather

Due to the freezing weather conditions across the region a number of our customers are experiencing no water or reduced pressure, caused by frozen pipes in their home. There are a few things you can do to check if you have frozen pipes. If you are unable to complete these checks please reach out to your family, friends or neighbours to see if they can help:

  1. If there are no local issues check with your neighbours. If they have water, you may have a frozen pipe in your property.
  2. Here’s what to do. Turn off your stop tap by turning it clockwise, it’s usually found under your kitchen sink, but can be in your garage or cellar.
  3. Once you’ve turned your stop tap off, turn on your cold tap in the kitchen
  4. If you have no water, this could be due to a frozen pipe somewhere in your home. This may be the pipe which comes into your home near to where your stop tap is located.
  5. Carefully thaw the pipe using a warm towel, or if safe to do so a hairdryer in short bursts, ensuring you keep well away from water. If you can get water from a neighbour you could try a hot water bottle too. This could take a while, depending on how frozen and big your pipes are.
  6. Switch your stop tap back on to see if the water is running.

You can find more information at www.unitedutilities.com/frozenpipes.

If you have followed all of the advice provided and still want to talk to us, please give us a call. As we are experiencing really high call volumes at the moment, please bear with us as wait times will be longer than usual. 

Due to the freezing weather conditions across the region a number of our customers are experiencing no water or reduced pressure, caused by frozen pipes in their home. For more help and advice if you have a frozen pipe head to www.unitedutilities.com/frozenpipes.

Cold Weather

Please click the button below to confirm you have seen this message

I have read this info